We’ve just shipped a solid round of updates across Project Documents, focusing on the Explorer, the Document Register, and how files move between the two. The goal here was simple: make document control faster, clearer, and way less painful on real projects. 💪 ⸻ Explorer: Now a
We’ve made some important improvements to how roles, permissions, and user access work in Deep Space. The goal is simple, make it obvious who can access what, apply changes instantly, and remove the confusion that often comes with managing users. Role changes now take effect stra
You can now link locations directly to all Delivery and HSEQ records - incidents, hazards, inspections, SWMS, permits, and more. How it works • Open any item from a register (e.g. an Incident) • The details drawer opens on the right • Click Link Location • Browse your nested Loca
We’ve just pushed a solid upgrade to production across all Delivery and HSEQ registers - the kind of stuff that saves time every single day. What’s in: • 🔍 Filters across all registers (status, trade, contractor, etc.) • 📅 Date range picker to slice data by created date • 📤 Ex
This update comes straight from customer feedback. As more teams have been running Deep Space day to day on live projects, site supervisors, PMs, and safety managers told us the same thing - the tools were doing the right job, but the menu order did not always line up with how th
Cost codes are one of the most critical foundations in a construction system, yet they are often treated as a quick setup task. A spreadsheet gets uploaded, everyone moves on, and the issues only surface later - budgets don’t roll up properly, reports become inconsistent, and pro
Locations on construction projects usually end up messy - “Level 2”, “L2”, “Second Floor”, all meaning the same thing. Over time that breaks reporting and makes site data unreliable. Deep Space now supports a Location Breakdown Structure (LBS). LBS lets you define a project-speci
Overview Optimized the Import capability in the Scheduling Tool to better support large and complex project files. The import process now supports XML files over 30MB by allowing them to be compressed and uploaded as ZIP files. In addition, the parsing and display of WBS (Work Br
Form Attachments Auto-Upload to Document Management What's New When you submit forms with file attachments (photos, documents, PDFs), those files are now automatically saved to your project's Document Management system. No more manual downloading and re-uploading! The Problem We
What's New You can now bulk import budget categories from an Excel file, making it faster to set up your cost structure. How to use Click the Import button in Budget Categories Download the Excel template Fill in your categories (Category ID, Name, Description) Upload the complet