What Got Shipped Today - 4/11/26 - Retention you control per subcontract, a Toolbox Talk register on every project, and signing links you can re-send

Published: 4 November 2026 Features Retention you can see, and control, on every subcontract claim User Story As a Commercial Manager, I had to leave the claim and rebuild the retention position from old claims, and I couldn't hold back more (or less) than the formula said without a support request, so I can now see the full retention position on the claim and set the figure myself on subcontracts that need it. Before The subcontract progress claim showed the contract and variation breakdown but no retention. Retention was always calculated automatically. Holding extra from a risky subcontractor, releasing early, or correcting last month's figure meant a back-end fix. After Every subcontract claim now has a Retention section: retention taken on previous claims, withheld on this claim, certified to date, and remaining to the cap. Each subcontract also has a Retention control setting, Automatic (the default, unchanged) or Manual. On a Manual subcontract, the payment schedule pre-fills the calculated retention and lets you take more, take less, take none, or release held retention. Any difference from the calculation is flagged and needs a reason. Manual releases flow through to net payable, the RCTI and the PDF, and show in the retention history with the calculated figure beside them. Impact You check retention at the moment you certify, not after. Retention becomes a commercial decision you record in the platform, with an audit trail, instead of a ticket to support. 1. The new Retention section on a subcontract claim: taken to date, this claim, certified to date and remaining. 2. The subcontract's retention control, shown here as Automatic. 1. The Retention control setting on the subcontract. 2. Manual pre-fills the calculated retention and lets you change it on each payment schedule. Known limitations: Manual control is set per subcontract and applies on the payment schedule. PSA, None and Bank Guarantee subcontracts stay Automatic. A Toolbox Talk register on every project User Story As a Site Manager or HSEQ Manager, I had no place in the Deep Space web app to see a project's toolbox talks, and our own toolbox form never counted alongside the standard one, so I can now review every toolbox talk for the project in one register. Before Toolbox Talk sat under HSEQ › Risk & Controls as an "under construction" placeholder. Talks submitted in DS Site lived only in DS Site, and a customer's own toolbox form was invisible to reporting. After HSEQ › Risk & Controls › Toolbox Talks is now a live register for the selected project. It lists every talk from the standard DS Site toolbox form, plus any of your own toolbox forms linked as sub-forms. Link Sub-Form lets you pick which fields hold the project and the date, so your form is filtered and counted correctly with no setup from us. Open any row to see the submission exactly as it was filled in. The weekly report now shows your last toolbox talk. Impact Toolbox talks stop being a DS Site-only record. You can see whether talks are being held, project by project, and the counts feed straight into HSEQ reporting. 1. Toolbox Talks under HSEQ › Risk & Controls. 2. The register lists talks from the standard form and every linked form. 3. Link Sub-Form brings your own toolbox form into the same register. Known limitations: Attendance sign-off and comparison against Site Sign On come in a later release. Re-send or cancel a head contract signing request User Story As a Contract Administrator, I had a head contract stuck at "Awaiting signatures" with no way to re-send the email or pull it back, so I can now re-send the signing link or cancel the request and send again. Before Once a head contract went out for e-signature, the Agreement tab only offered Check signature status and Upload executed copy. If the client never got the email, or it went to the wrong address, the contract was stuck. After A head contract awaiting signature now has Re-send signing email (a fresh link to the original signer) and Cancel signing request (with an optional reason). Cancelling withdraws every link already sent, so a client who opens an old one sees that the contract has been withdrawn. The contract returns to its pre-send state, ready to correct and send again, and Revert to Draft is no longer blocked. Impact No more contracts frozen in limbo. A bounced email or a wrong address is a two-click fix. Move the PO commitment along with a cost transfer User Story As a QS correcting a cost code, I moved the actual but its PO commitment stayed behind, leaving a negative balance on the old code, so I can now move both together. Before Transferring a PO-linked actual to the right cost code left the PO's commitment on the old code. The Budget Register showed committed cost and a negative remaining balance on a code that no longer had any actuals. After When you transfer a PO invoice, you choose Move actual and associated commitment (the default where the PO line can move) or Actual only. A before and after preview shows Actuals, Committed, Open commitment and Remaining for every code involved. Transfers already made get an Align linked commitment action in the Actuals drawer. The issued PO and its PDF don't change, the PO shows the effective cost code under each affected line, and the Activity Timeline records who moved what and why. Impact Cost code corrections leave both codes reconciled, so the Budget Register tells the truth without a manual journal. 1. The PO commitment panel shows whether a PO line's commitment moves with the transfer. On this invoice there's no PO line commitment on the code, so only the actual moves. 2. Cost transfers are limited to the commercial team. Known limitations: Creating, voiding or aligning a transfer now needs a commercial project role (Commercial Lead, Contracts Manager, Contract Admin or Quantity Surveyor) or workspace manager access. Moving a whole subcontract's commitment comes later. Improvements RFIs raised from a KAI drawing change show their live status User Story As a Project Manager reviewing a drawing revision, I raised an RFI from a KAI change and then lost track of it on the compare, so I can now see its status right on the change it came from. Before An RFI raised from a change in the register compare left no trace on that change once it was saved as a draft or issued. After Each change now carries a chip for any RFI raised from it. A draft shows as "RFI · Draft" and reopens the same draft. Once issued (even from the Notices page), the chip shows the RFI number and its live status, such as Awaiting response, and opens the notice. Impact The compare becomes a working record of what you've chased, not just what changed. 1. An RFI raised from a KAI change, showing its number and live status on the change itself. System folders are labelled and grouped in Project Documents User Story As a Document Controller, I couldn't tell the folders Deep Space manages from the ones in our folder template, so I can now see them labelled and kept together. Before Folders the platform creates and relies on (such as Site Photos, Forms and the portal folders) looked identical to your own folders and were mixed in with them. After System folders carry a System pill and sit together in their own group below your folders, in every workspace. Impact Your folder template stays yours, and nobody renames or reorganises a folder the platform depends on by accident. 1. System folders grouped together, each marked with a System pill. Fixes The Critical Path network view loads, and deleted tasks take their links with them Before One dependency pointing at a deleted task could stop the Critical Path / Network view from rendering at all, and the page kept retrying. Deleting a task left its dependency links behind. After The network view skips links to deleted tasks and renders. Deleting a programme task (single, Gantt multi-select, drafts or Delete all tasks) now removes its dependency links too, with no dates moving. Leftover links from earlier deletions have been cleaned up across all workspaces. 1. The Critical Path Network Diagram loading with its task counts. 2. A critical path task rendered in the network. NZ bank accounts no longer flag as changed over suffix padding Before The bank detail check compared NZ account numbers as exact text, so 12-3072-0081958-00 and 12-3072-0081958-000 (the same account) showed a red "Bank details changed" flag. After NZ account suffixes are normalised before comparing, so -00 and -000 match. A genuine change of bank, branch, account or suffix still flags red. This applies to supplier invoices, subcontractor claims, payment schedules and RCTI / BCTI. The PO cost code picker shows every code on large budgets Before On projects with large budgets, the Cost Code picker on a new PO line item was cut short, and some budgeted codes were missing. After The picker now returns every cost code in the workspace. 1. The Cost Code picker on a new PO line, listing budgeted codes with their revised budget and remaining amount. POs aren't blocked when compliance isn't set up Before In a workspace with no compliance workflow configured, selecting a supplier on a new PO showed "Compliance can't be checked right now", and Retry didn't clear it. After A missing compliance setup is treated as "not set up", so the PO goes ahead under the workspace's compliance settings. Worker Details and Edit labour fixes Before Send Induction could stay disabled on Worker Details, a subcontractor worker's custom worker fields showed blank, and Edit labour blanked a worker's trade if it wasn't one of seven built-in trades. After Send Induction works, custom worker fields show their values, and Edit labour keeps any trade you've set. Got feedback on any of these? Tell us through the feedback portal in the platform (the Feedback tab on the right of every page).

How do you feel about this update?

Tap a face to rate