What Got Shipped Today - 3/11/26 - Step through KAI drawing changes, correct an approved forecast, and payment schedules that reach Xero on their own
Published: 3 November 2026 Features Step through every KAI drawing change, up close As a document controller comparing two revisions of a dense A1 sheet, I used to read "middle right of the drawing" on a KAI change card and then go hunting, so I can now click the change and see it zoomed in on both revisions side by side. Before KAI listed what changed between revisions, but each card only gave a text location. Clicking a card did nothing. On a busy structural sheet you still had to scan the drawing yourself to find the change. After Click any KAI change card and a focus view opens over the sheet. It shows the old and new revision crops side by side, zoomed in on the change, with linked pan and zoom. Arrow keys (or Next change) step through the list, Esc closes, and Show on sheet jumps the main drawing to that change's marker. It works the same in Overlay, Side by side and Swipe. Impact Reviewing a revision goes from scanning a whole sheet to walking a list. Small changes, like a revised issue date or a renumbered detail, stop slipping through because you see both versions of the exact spot at once. (1) Step through the changes with the arrows or your keyboard. (2) The old and new revision crops sit side by side, zoomed on the change. (3) Show on sheet closes the view and jumps the drawing to that change. Correct an approved monthly forecast without reverting it As a project manager who spots a wrong FTC straight after approving the month's forecast, I used to be stuck with the wrong numbers until next month, so I can now correct the approved forecast and re-approve it with a full audit trail. Before Once a monthly forecast was approved it was locked. A mistake found the day after approval sat in the Budget Register, WIP and Executive views for the rest of the month, and the only answer was "it can't be reverted". After The latest approved period now has a Correct forecast action. Give a reason and it opens a new version as a draft, copied from the approved one. The approved version stays in force until the correction is approved through the normal approval flow, then it is marked superseded. Discard the correction and nothing changes. A version history shows every version of a period, who corrected it and why, and the Snapshots tab now carries a Version column. Impact Month end numbers can be fixed the same day without breaking the approval record. Finance and executives keep reading one trusted version, and every correction is explained. (1) The new Version column on Forecast Snapshots. (2) A corrected forecast adds a new version and keeps the one it replaced, marked superseded. Known limitations Only the latest approved period can be corrected, and not while a later month's draft exists (delete that draft first). Progress claims that separate the building work from your overheads As a QS on a head contract, I used to claim my site running costs and margin as if they were just more trade lines, and work the margin out by hand, so I can now label every claim line by what it is and let the margin claim itself. Before Every line on a progress claim looked the same. Site running costs (preliminaries) and margin sat among the trades, and margin was claimed as a guessed percentage each month. The client's engineer had no summary to check them against the contract rates. After Every claim line now carries a Category label, so the claim reads the way NZS 3910 contracts are set out: Works: the actual building work, meaning the trade lines such as demolition, framing, plumbing or electrical. Any line not set to something else is Works. On-site Overheads: the cost of running the site, often called preliminaries or P&G (site supervision, site sheds, scaffolding, fencing). Off-site Overheads: head office costs and margin. Provisional Sum: an allowance for work that isn't fully defined yet. A summary under the claim adds them up: Works, On-site Overheads, the subtotal, then Off-site Overheads at the contract rate. The same summary prints on the claim document. (1) Every claim line carries a Category label. In this example every line is building work, so all show Works. (2) The overheads summary adds up Works, On-site Overheads, the subtotal and Off-site Overheads at the contract rate. How a line's category is chosen By cost code. In Company Settings > Commercial > Head contract claims, switch Claim categories on and add cost code ranges, for example 100-000 to 199-999 as On-site Overheads and 800-000 as Off-site Overheads. The first matching range wins. Any cost code that matches no range is Works. Rates per contract. Each head contract's Claim settings holds its own On-site and Off-site Overheads %. Leave them blank to use the project defaults. Change it on the claim. On a draft claim you can change a line's category. The change sticks for future claims on that contract and is logged in the claim activity. Off-site claims itself. With "New Off-site lines claim automatically" on, the Off-site Overheads line claims the contract's Off-site % of this period's Works plus On-site Overheads, capped at what is left on the line. Switch it to manual on any claim. (1) Switch claim categories on. (2) Add cost code ranges to set each line's category. Anything outside a range is Works. (3) Let the Off-site Overheads line claim itself each period. (1) Each head contract sets its own On-site and Off-site Overheads %, or uses the project defaults. Impact Margin is earned in step with the work instead of estimated, and the claim arrives in the same layout as the contract, so the client's engineer can check and certify it faster. Known limitations On by default for New Zealand workspaces. Switch it on in Company Settings elsewhere. Not used on Cost Plus contracts. Claims already served keep the settings they were served with. Materials on site and off site on claim lines is coming next. Improvements Payment schedule PDFs reach the Xero bill automatically As a contract administrator who accepts and pushes payment schedules straight from the drawer, I used to send bills to Xero without the payment schedule attached unless I remembered to press Attach, so the certificate now files itself. Before The payment schedule PDF only reached the schedule's Documents, and from there the Xero bill, when someone pressed Attach on the template card. Accept and push without it, and the bill carried only the subcontractor's invoice. After Accept, Accept & Push to Xero, and a manual Push to Xero now generate and file the payment schedule PDF first, so the Xero bill shows it beside the subcontractor's invoice. Submitting for approval files the exact PDF being approved. Pressing Attach later files a new version, not a duplicate. If the PDF can't be generated, the acceptance or push still goes ahead and you see a warning. Impact Every bill in Xero carries the certificate that backs it, with no extra click and no audit gaps. (1) The payment schedule PDF filed on its own when the schedule was accepted and pushed. (2) The schedule shows Accepted and In Xero. Pending variation cost counts in the forecast, not as an overrun As a project manager whose subcontract variation is approved while the client variation is still pending, I used to see that cost flagged as an overrun, so the forecast now carries the variation's cost and sell together. Before Cost committed through an approved subcontract variation, sitting on a head contract variation that wasn't approved yet, read as an overrun with no budget cover. Genuine overruns were mixed in with work that was being recovered. After The Monthly Forecast has a Pending VO Cost column (Submitted head contract variations, plus Draft ones whose subcontract cost is approved). Variance is measured against Revised Budget plus Pending VO Cost, default FTC includes the part of a pending variation not yet bought, and affected lines are tagged "VO-funded, sell pending". Draft variations with approved subcontract cost now count in the Financial Summary, and the Budget Register shows a "Draft variations not in budget" banner. Impact Forecast variance shows real overruns, not paperwork timing. A variation's cost and sell move through the forecast together, at the same status. (1) The new banner on the Budget Register lists draft variations not yet in budget, and how much of their cost is already in the forecast as Pending VO Cost. Known limitations Forecasts already approved keep their stored values. Draft forecasts pick the change up on Refresh from BR. Site Diary photos land in Site Photos As a project manager reviewing site progress, I used to find photos from DS Site site diaries buried in the diary's form folder, so they now appear on the project's Site Photos page with everything else. Before Photos added to the Site Photos field of a Site Diary on DS Site were filed with the rest of the diary, so they never showed on the Site Photos page. After New Site Diary photos go straight to the project's Site Photos. Attachments such as delivery dockets and inspection reports stay with the diary. Each file is filed once, and re-syncing a diary creates no duplicates. Impact One place for every site photo, whether it was captured on its own or as part of the daily diary. Known limitations Applies to diaries submitted from today. Earlier diary photos stay where they are. Fixes Several licences for one worker stay separate As an HSEQ admin uploading a worker's licences, I used to watch three different licences collapse into one document when the files shared a name, so each licence now keeps its own row, type and expiry. Before Uploading licences with the same file name (for example, three files called backup.pdf) merged them into one document as new versions. The earlier licence types, and their expiry reminders, disappeared. After The licence or insurance type decides the document, never the file name. A new type always files as a new document, named for its type if the file name is taken, and every version keeps its own file. Worker Details now shows the type on every row, the upload dialog tells you whether an upload adds a new document or renews an existing one, and Upload and add another lets you enter several licences in one go. The same rules apply to licences captured on DS Site. Impact Compliance records match what was uploaded, and every licence keeps its own expiry tracking. Percentage lines on variations price to the cent As a QS pricing a head contract variation with a P&G percentage line, I used to see totals a few cents off my own sums, so the markup I enter now produces exactly that markup in dollars. Before On a "Percentage of works subtotal" line, a markup was converted to a rounded margin and the sell worked out from that. 12% markup on $800 gave $95.86, and the error carried onto the Variation Order. After Percentage lines now price from the field you typed, at full precision. 12% markup on $800 gives $96.00, and margin is derived for display only. Impact Variations sent to the client match your own working to the cent, so there is nothing for the engineer to query. Known limitations Variations already approved or submitted keep their saved totals. Got feedback on any of these, or something you'd like next? Tell us through the feedback portal in the platform.
How do you feel about this update?
