SchedulingJul 13, 2026

Working Days Calendars for Construction Program

User Story As a Project Manager, I couldn't tell Deep Space which days a project actually works, so public holidays, RDOs and site shutdowns just sat inside the programme like any other working day. I can now set a project calendar once and have every date downstream respect it. Before Construction Program had no concept of non-working time. Every date on the Gantt and Calendar assumed a continuous working week, so a Christmas shutdown or a run of RDOs had to be worked around by hand, or ignored altogether. After Every project now has its own Project Calendar, opened directly from Construction Program. Set the working week (5, 6 or 7-day), then add public holidays and shutdown periods one at a time, or import a full year of state public holidays in a single click. Import public holidays pulls in the correct set for the project's state and year, twenty-plus dates added in one action instead of typed in by hand. Impact Once saved, the Gantt and Calendar shade weekends and non-working days in grey and public holidays or shutdowns in amber, using the project's own location and calendar rather than a generic default. Programme dates now reflect how the site actually runs. No more manually adjusting durations around Easter or a Christmas shutdown, and blocked-out periods are visible at a glance instead of buried in someone's memory. Keep the feedback coming, we're here to listen to you, and thanks for your support.

How do you feel about this update?

Tap a face to rate