CommercialJan 22, 2026

📥 More flexible ways to build your schedule of values

Not every job starts with the same inputs. Sometimes your schedle of values (sov) is driven by the budget. Other times it comes straight from the client as a detailed breakdown that needs to be followed exactly. The schedule of values setup flow now supports both approaches, with a faster way to handle larger SOVs. Two options when setting up your SOV When you set up a schedule of values, you now choose how it will be built: Generate from the budget register This option uses the budget register lines linked to the head contract as the starting point. It’s ideal when your internal budget structure matches how you want to claim and report, and keeps everything closely aligned to cost codes and forecasting. Use the client’s breakdown For contracts where the client dictates the SOV structure, you can now build the SOV to match their format exactly. This path includes a new bulk import workflow: Download a simple Excel SOV template Fill it out using the client’s breakdown Upload the file to create all SOV items in one step Review and adjust values before continuing Map SOV items back to your budget codes as part of the normal flow Manual entry is still available, but bulk import makes a big difference on jobs with long or detailed SOVs. Why this matters The schedule of values becomes the backbone for progress claims, invoices, payment schedules, and WIP. Getting it right upfront saves time every month after that. This update: Removes hours of manual data entry on larger contracts Reduces the risk of transcription errors Preserves the client’s agreed breakdown from day one Makes claims faster and more consistent once the job is live By supporting both budget-driven SOVs and client-driven SOVs, and adding a simple download-and-upload template, you can set up contracts faster and keep the commercial process cleaner for the life of the job.

How do you feel about this update?

Tap a face to rate